Welcome to the new version of CaltechAUTHORS. Login is currently restricted to library staff. If you notice any issues, please email coda@library.caltech.edu
Published July 10, 2018 | Published
Book Section - Chapter Open

Lessons learned in extended-extended Spitzer Space Telescope operations

Abstract

The Spitzer Space Telescope is executing the ninth year of extended operations beyond its 5.5-year prime mission. The project anticipated a maximum extended mission of about four years when the first mission extension was proposed. The robustness of the observatory hardware and the creativity of the project engineers and scientists in overcoming hurdles to operations has enabled a substantially longer mission lifetime. This has led to more challenges with an aging groundsystem due to resource reductions and decisions made early in the extended mission based on a shorter planned lifetime. We provide an overview of the extended mission phases, challenges met in maintaining and enhancing the science productivity, and what we would have done differently if the extended mission was planned from the start to be nearly twice as long as the prime mission.

Additional Information

© 2018 Society of Photo-optical Instrumentation Engineers (SPIE).

Attached Files

Published - 107041D.pdf

Files

107041D.pdf
Files (254.1 kB)
Name Size Download all
md5:88d73d18a8b2ebd955cfdfab750e8529
254.1 kB Preview Download

Additional details

Created:
August 19, 2023
Modified:
January 14, 2024